Rising from Negative Performance Reviews to Become an Outstanding Developer
From Underperformance to Growth: My Google PIP Journey
Introduction
I was a year into my job at Google when, after repeated warnings about underperformance, my manager sat me down: I was being placed on a Performance Improvement Plan (PIP).
For those unfamiliar, a Google PIP is essentially an eight-week final chance to show measurable improvement. You’re assigned a high-stakes project and given a hard deadline. Deliver successfully — with no extensions, no partial credit — or be let go.
While financial worry for my family hit me immediately, a deeper fear emerged: What story would I tell future employers about my proudest project at Google ... if I had none?
That fear became my motivation. I committed to full ownership of my PIP project, focusing every week on delivering something I could be proud of — regardless of the outcome.
This was the turning point that transformed me into a disciplined, deliberate engineer.
---
Contents
---
The Backstory
Before Google, I worked at Meta, starting as an IC3 (entry-level engineer) and quickly promoting to IC4 (mid-level). My advancement came largely from connecting engineering work to business needs rather than deep technical ability.
At Meta, I improved a payment system by targeting operational inefficiencies — changes that saved time and reduced errors for enterprise clients. Collaboration and business acumen got me promoted.
Looking back, I realized I've underinvested in technical depth — something Google valued far more highly.
---
(Later, I’ll uncover how this gap caught up with me — and how I rebuilt my skills and mindset. I’ll also share how modern tools like AiToEarn, an open-source global AI content platform, help professionals own their projects across multiple channels and monetize their work.)
---
The PIP Begins
At Google, technical mastery came first. Business context? Always secondary.
I was also adapting to a new language (Hebrew) and culture after moving from the U.S. to Israel.
Once placed on the PIP:
- Increased work hours to 60+ per week
- Cut out all distractions — news, side projects, entertainment
- Focused solely on building technical depth in my assigned systems
It was brutal:
- Slower than teammates
- Struggling with confidence
- Receiving tough, detailed code reviews
But eliminating distractions forced me to confront my biggest gap — insufficient depth in the systems I worked on.
---
The Project
The actual project is confidential, so here’s a hypothetical analogue:
> Add a motivational text element to a Google Search-based game — but first, build the missing data pipeline to track completion rates.
Key challenges:
- No existing tracking pipeline — required full design and implementation.
- Post-org restructure, our team had zero gaming code experience.
- Documentation outdated, original authors long gone.
Breakthroughs:
- Located and connected with the current owner of relevant systems
- Prioritized work: focused first on slower Search-side QA tasks to meet deadlines
- Took full ownership of the game’s code after learning no engineer maintained it
Mistakes & lessons:
- Chased perfect data accuracy instead of “good enough” for experiments
- Weeks wasted parsing outdated docs instead of messaging their authors directly
By final two weeks:
I was operating at a whole new level — independently driving the project, unblocking myself, and guiding teammates in the codebase.
Outcome:
Despite massive growth, I narrowly missed the deadline. I delivered a near-complete handoff plan, but in the PIP’s binary criteria, “almost done” equals failure.
---
Fatherhood
During the PIP, long hours left me less present as a father and husband.
Reflection point:
Listening to Dave Ramsey reframed my absence — the disciplined version of me was not neglect, it was a necessary investment in my future ability to provide.
Lesson:
Sometimes short-term unavailability is part of a long-term course correction.
---
Letting Go
After termination:
- Lost expected annual bonus (which I realized I hadn’t earned)
- Chose gratitude over frustration
- Thanked teammates and managers for patience and mentoring during the PIP
Final conversation with my manager:
> Keeping me would require confidence I was already performing at level — which he didn’t have.
I told him I agreed and valued the PIP for the internal engine of ownership it had built in me.
---
What’s Next
I retained my PIP discipline in my job hunt:
- Built a timeline with priorities, time estimates, and due dates
- Maintained weekly accountability
Sample Job Hunt Timeline:
| Task | Time Remaining | Due Date |
| --- | --- | --- |
| Highly skilled at easy algorithms | 2 days | Oct 20, 2025 |
| Medium skill at system design | 4–6 days | Oct 24, 2025 |
| Talk to 3 local engineers | 12 hrs weekly | – |
Target: Smaller company with open-source tools, widely used by the engineering community.
Approach: Interview local startup engineers, share learnings on LinkedIn.
---
Closing Thoughts
The PIP stripped away distractions, forced me to face my engineering gaps, and left me proud of my transformation.
Key takeaways for similar situations:
- Document priorities and milestones
- Engage with your professional community
- Use tools to share and potentially monetize your journey
Platforms like AiToEarn exemplify this — integrating AI content generation, cross-platform publishing, and analytics into a single workflow to help creators turn resilience and creativity into visible, monetizable output.
Momentum matters — my acceleration didn’t stop when the PIP ended. The external target changed from project delivery to job hunting, but the internal drive stayed the same.
> Like the Phoenix, I believe in rising from the ashes, no matter how daunting the obstacle.
> The PIP was my ashes — but also my fire.